The down working was caught briefly between the bare branches at Tywardreath, and then returning along Rundles Walk at Middleway St Blazey. The sun eluded me at Golant unfortunately!
Earlier in the day, I was "collecting" class 153's at Par, with three in the branch platform. A lorry had wedged itself under a road bridge near Bugle, and the first two trips on the branch were cancelled. The other unit had failed the day before and was sorted by the mobile fitter.
Cheers Craig Many thanks Craig