Royal Albert Bridge
Andrew Hickson
A head for heights was required today when routine inspection work was being carried out on the Royal Albert Bridge.
Andrew Hickson
Crossing the Tamar
Now there were there only seven of us left!
Peter Butt
Royal Albert bridge Inspection
Andrew Hickson
I have just read Peter Butt's article. Unbelievable!
Yesterday they had 2 men on lookout at the end of the platform at Saltash and presumably two at the Plymouth end.
There were also a further two men on standby at the river edge ready to jump into their boat should someone take a fall from the bridge!
Andrew
David Tozer
Roger Salter
Neil Phillips
Today (14th March) being an island of sunshine in a sea of dismal days I called in to Par station on my way for a walk on the beach. Capturing these three trains in ten minutes, including a pair of HSTs passing, was only possible because two were running late!