NINETEEN SIXTY FOUR – PART 132
Carmarthen to Aberystwyth 1963 (1)
Michael L. Roach
In the summer of 1963 there were still pockets of steam all over the Western Region of British Railways, but in the following 24 months most of them would disappear as the steam-worked lines were either dieselised or closed down. I decided to take a week off work to seek out some of the remaining steam lines. The Western Region and the Great Western before it had a number of interesting cross-country and secondary routes, generally serving a string of small towns and villages, with a bigger town or a junction station at each end, and one feature common to them all was a limited number of trains each day. Lines that come to mind are Didcot to Eastleigh; Taunton to Barnstaple; Cheltenham to Andover; Ruabon to Barmouth; and Carmarthen to Aberystwyth. Only one of these would escape me completely, and that was Cheltenham to Andover. In the summer of 1963 I still had a couple of these lines to do, and one was Carmarthen to Aberystwyth which I would endeavour to do on my week's holiday.
The Carmarthen to Aberystwyth line was single track, 56 miles long and had just 3 passenger trains each way Monday to Friday. I believe that there were also 2 freight trains which travelled the full length of the line as well as shorter distance freight trains at the south end of the line. In 1963 Monday to Friday passenger trains left Carmarthen at 6.10am, 10.35am and 5.50pm; and Aberystwyth at 7.15am, 11.55am and 5.40pm. These trains would normally cross each other on the passing loops at Tregaron, Strata Florida and Lampeter; although they could cross almost anywhere if running late as most of the stations had a passing loop and a signal box. There were 2 extra trains each way on Summer Saturdays, one of them being a limited stop service. Northbound this service conveyed through coaches from Swansea (High Street) to Pwllheli, while southbound the through coaches were from Penychain to Carmarthen. Swansea to Pwllheli was a 7-hour journey.
At the northern end steam locos to work the line came from Machynlleth Shed, through its sub-shed at Aberystwyth; and from Carmarthen Shed at the southern end. Carmarthen Shed closed in April 1964, after which the locos for this line would run light engine more than 20 miles from and to Llanelly Shed. At the time of my trip in July 1963 the line still had 100 percent steam haulage. This would change at the end of 1963 when Hymek diesels acquired one return working over the line; the 6.10am northbound and the 11.55am return working from Aberystwyth. This one working would continue for nearly 12 months until full dieselisation occurred only a couple of months before the line closed to passengers in February 1965. The Manor class 4-6-0s had been staple motive power for many years on passenger trains, but Churchward 2-6-0 tender locos, Collet 0-6-0s tender locos and BR Sandard Class 4 2-6-4 tanks and BR Standard Class 3 2-6-2 tanks also made appearances, while pannier tanks and Churchward 2-6-0s worked the freight trains.
I purchased a one-week Western Region Rail Rover ticket costing £10 in 1963, which equates to less than £1.50 per day for unlimited travel over the Western Region. No worries about buying singles or returns, or peak-hour restrictions, or indeed any ticket at all after the first one. The price of £10 sounds like a real bargain now, but at the time it was more than a complete week's salary for me. The ticket was dated from Saturday 20 July to Friday 26 July 1963. I lived in Plymouth at the time, which is hardly what one would call central for the Western, so I would have to stay in bed and breakfast some nights.
I had a very long day on the first day of the ticket, Saturday, travelling 650 miles in the 24 hours. I decided to rest on the Sunday, and then travel overnight Sunday to Monday in order to catch the first train of the day out of Carmarthen, the 6.10am to Aberystwyth. I left Plymouth at 8.10pm on Sunday 21 July on the overnight train to Paddington, which also had coaches and sleepers for Manchester. I changed at Bristol Temple Meads and again at Cardiff General where I picked up the 9.25pm Paddington to Neyland train, which on this night had 11 coaches hauled by a Hymek diesel locomotive. This brought me to Carmarthen Station at 5.41am, some 21 minutes late. The Hymek had taken two and three quarter hours to cover the 75 miles from Cardiff to Carmarthen. Sunrise had been a couple of minutes before 5.00am so it was fully light as I waited for departure from Carmarthen Station for my first trip along the line to Aberystwyth. I would not be disappointed by the trip. The locomotive was Manor Class 4-6-0 7810 "Draycott Manor" of Oswestry Shed which I had seen the previous September at Moat Lane Junction on an Aberystwyth to Crewe train. I would see 7810 again 3 days later on Thursday 25 July at Shrewsbury where it took over the down Cambrian Coast Express of 8 coaches. 7810 was transferred to Machynlleth Shed in December 1963 and withdrawn from service in September 1964. The Manor class locos had first appeared on the Carmarthen to Aberystwyth line during World War Two working munition trains from South Wales to Saltney Junction, Chester; presumably routed this way to avoid large centres of population.
The 6.10am train consisted of 4 corridor coaches and one truck which was shunted off en-route. The load would prove to be no problem for a Manor, and was well within its load limit for the line. I could see immediately that there was a grave shortage of passengers for the train so I walked right through the four coaches to find that there was just one other passenger apart from me. This gave me an idea. I would record the number of passengers boarding and alighting at every station and halt. It was not a very onerous task as it turned out. In the days of steam I usually travelled in the first coach and in the first compartment if available, although most of the time I would be at the window in the door listening to the locomotive. There was something very special about standing at the open drop-down window of a steam train when travelling through lovely countryside, many delightful stations with two platforms, crossing loops, signal box, semaphores, water cranes, staff, but in many cases very few passengers. There were steep gradients, delightful villages, wooded river valleys, fertile farmland, bog, and views of the Cambrian Mountains. This train could have served a number of purposes. A connection off the overnight train from London; a commuter service into Lampeter, probably a bit early for that; or a commuter service into Aberystwyth. In fact it was the last reason as it turned out, but the first train southbound was probably no good for workers commuting the other way into Carmarthen as it did not arrive there until 9.27am.
The train left Carmarthen two minutes late and would be a minute or three late at most stations throughout the journey, finally arriving at Aberystwyth just half a minute late. The maximum lateness was 5 minutes at Strata Florida and 4 at Tregaron awaiting the arrival of 82031 on the 7.15am from Aberystwyth to cross our train. In fact we were stopped at Tregaron for 14 mins awaiting 82031 and the token. Knowing that the first train into a crossing point means last out I left the train to photograph my train from the opposite platform and to photograph 82031 arriving at Tregaron before boarding the train again. I was lucky to do this many times on single lines without ever being left behind. We stopped at every station, bar one, that we should have but many for as little as half a minute. The exception was Bronwydd Arms which was passed slowly without stopping. We stopped at three of the four request stops which were Llangybi, Olmarch, Alltddu and Felindyffrin.
The towns and villages along the line had (and still have) remarkably small populations. The only ones with a population in excess of 1,000 persons at the 2011 census were Llanilar 1,085, Tregaron 1,173, Llanybyther 1,423 and Lampeter 2,970. The biggest town in Cardiganshire is Aberystwyth with a population of about 16,000 persons. The second biggest town in the County is Cardigan which once had its own branch line until closure in 1962. Cardigan has a population of about 4,200 persons. I think this shows the scale of the problem facing public transport in the area. And so to the details of what I witnessed out the window of the train on that Monday morning long ago.