Rails around Sidmouth
Andrew Hickson
To avoid being exposed to the sea, a tunnel a third of a mile in length was cut through the hill and then ran parallel with the cliff face. The construction of a steam locomotive was commissioned and was delivered by sea at Exmouth after they realised there was no sufficiently large enough crane to offload it at Sidmouth. It was drawn by horses over the hills to Sidmouth. Unfortunately they then discovered the engine was too large to fit into the tunnel and so the whole idea of transporting the stone was abandoned.
Instead the locomotive was used for a couple of years as a curiosity, coupled to some wagons and for a small fee people could be taken up and down the esplanade for a ride. By 1838 the locomotive and the piles of the viaduct were removed.
The tunnel was also bricked up to prevent it being used to conceal smuggled brandy!